The grey market premium of the Sattva Engineering Construction IPO, day by day, against the ₹75 upper price band. Last figure from 3 Sep 2025.
The GMP of the Sattva Engineering Construction IPO started at ₹0 on 19 Aug 2025 and ended ₹24 before listing, up ₹24 over 16 days.
It peaked at ₹26 on 30 Aug 2025 and was lowest at ₹0 on 19 Aug 2025. In the last 4 days it fell by ₹2.
From one recorded day to the next, the GMP rose on 5 days, fell on 1 day and held on 9 days. The largest one-day move was a rise of ₹15 on 22 Aug 2025.
On the day bidding opened, 26 Aug 2025, the GMP was ₹19; on the day it closed, 29 Aug 2025, it was ₹25.
Bidding closed with the issue subscribed 198.17× overall.
At the ₹75 upper band, today's GMP points to a listing price of about ₹99, 32% above the issue price.
One lot is 1600 shares, ₹1,20,000 at the ₹75 upper band. On this SME issue an individual applies for at least 2 lots, ₹2,40,000.
The last GMP pointed to a gain of ₹38,400 on one lot.
At the highest GMP, ₹26, the figure for one lot was a gain of ₹41,600; at the lowest, ₹0, it was no gain.
| Date | GMP | Over issue price | Implied listing | Change |
|---|---|---|---|---|
| 3 Sep 2025 | ₹24 | 32% | ₹99 | – |
| 2 Sep 2025 | ₹24 | 32% | ₹99 | −₹2 |
| 1 Sep 2025 | ₹26 | 34.67% | ₹101 | – |
| 31 Aug 2025 | ₹26 | 34.67% | ₹101 | – |
| 30 Aug 2025 | ₹26 | 34.67% | ₹101 | +₹1 |
| 29 Aug 2025 | ₹25 | 33.33% | ₹100 | +₹6 |
| 28 Aug 2025 | ₹19 | 25.33% | ₹94 | – |
| 27 Aug 2025 | ₹19 | 25.33% | ₹94 | – |
| 26 Aug 2025 | ₹19 | 25.33% | ₹94 | +₹2 |
| 25 Aug 2025 | ₹17 | 22.67% | ₹92 | +₹2 |
| 24 Aug 2025 | ₹15 | 20% | ₹90 | – |
| 23 Aug 2025 | ₹15 | 20% | ₹90 | – |
| 22 Aug 2025 | ₹15 | 20% | ₹90 | +₹15 |
| 21 Aug 2025 | ₹0 | 0% | ₹75 | – |
| 20 Aug 2025 | ₹0 | 0% | ₹75 | – |
| 19 Aug 2025 | ₹0 | 0% | ₹75 | – |
GMP is an unofficial price from the grey market before the shares list. It is not a guarantee of the listing price and can move sharply from one day to the next. Read how we collect it in our methodology.